Voir en

français

Service availability during CERN annual closure 2018/2019

The Service Desk will be closed during CERN end-of-year closure. Your urgent requests will be redirected to the relevant support groups

Please note that the Service Desk will be closed during that period, however in case of urgent requests, you can call/contact (+41 22 76) 77777. Calls will be redirected to the relevant support groups.

General Services
As always, like the emergency and fire service (7 4444), the security service remains operational 7/7, 24h /24h and reachable via 78878. However, the services provided by the SMB department requiring human presence (such as CERN hotel, the car sharing service, the shuttle service, etc.) will not be operational during the end of the year closure. Services that do not depend on a continuous human presence will remain available offering a reduced level of support during this period. In general, the response time to normal problems will be a half day (no guarantee), but in case of serious failure, the reaction time will depend on the arrangements that have been made with the supported services.

Any incidents will be documented on the CERN Service Status Board. For more information, please consult the CERN Service Portal.

Please also note that the heating of the Meyrin and Prévessin sites will be switched into a low mode. This reduced level will lead to a slight drop in temperature, in order to gain energy savings during this period of low occupancy.

Computing Services
Most of the services provided by the IT department - including WLCG production services - will remain available during the CERN annual closure. No interruptions are scheduled but in case of failure, the restoration of services cannot be guaranteed.

Problems will be dealt with on a best effort basis only and the availability of specific services might be limited by the availability of other services.

Please note that:

  • All network and telecom services will run as usual, field technicians will act upon failures on the infrastructure, but changes requiring human intervention will not be possible.
  • Incidents will be listed on the CERN Service Status Board for Computing.
  • With the exception of 24 & 25 December and 31 December & 1 January best-effort support can be expected for the following services: activation of accounts, AFS, CASTOR, CDS, CERN Analysis Preservation, CERN Grid Services, CERNBox, Cloud Infrastructure, Configuration Management Service, CVMFS, Dashboard Monitoring Service, Databases, E-mail, EOS, FTS, GitLab, Indico, Inspire, Java web hosting, JIRA, Linux, lxbatch, lxplus, Lync, Network & Telecoms, Open Data Repository, Oracle web hosting (Apex), Printing, resetting passwords, room booking system, ServiceNow, SVN, TWiki, Vidyo, Web Services, Windows & Windows Terminal Services and Zenodo Repository.
  • The backup service will remain operational, but backups cannot be guaranteed and file restores may not be possible.
  • For the CASTOR service, damaged tapes will not be processed.

The operator service will be available and can be reached at 75011 or by email to computer.operations@cern.ch, where urgent problems may be reported.

Potential computer security incidents must be reported to Computer.Security@cern.ch or 70500 as usual.

Please remember to shut down and power off any equipment in your office that is not required during the annual closure.