ID:
CERN-PHOTO-201804-093-1
New CCT Magnets in 927
2018-04-12
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN
ID:
CERN-PHOTO-201804-093-11
New CCT Magnets in 927
2018-04-12
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN
ID:
CERN-PHOTO-201804-093-21
New CCT Magnets in 927
2018-04-12
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN
ID:
CERN-PHOTO-201801-005-19
HL-LHC kicker magnet (MKI): last vacuum test, preparation for transport to LHC transfer line in underground tunnel.
2018-01-15
Conditions of Use
©
2018 CERN
Brice, Maximilien: CERN
ID:
CERN-PHOTO-201801-010-13
The Cold-box, produced by Linde Kryotechnik for the SPS crab-cavity test stand for HL-LHC, on its arrival at CERN. It wll be transported into the tunnel in horizontal position and then will have to be tilted in its operational position, on its vertical ax
2018-01-18
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN
ID:
CERN-PHOTO-201801-010-5
The Cold-box, produced for the SPS crab-cavity test stand for HL-LHC, on its arrival at CERN. It wll be transported into the tunnel in horizontal position.
2018-01-18
Conditions of Use
©
2018 CERN
Ordan, Julien Marius: CERN