News
News
LS2 Report: The PS’s magnets prepare for higher energies
Following our article on the PS Booster, we take a look at the next link in CERN’s accelerator chain: the venerable PS and its magnet system
LS2 Report: metamorphosis of the Booster
In the first of our series of articles on work done during LS2, we focus on the second link in the accelerator chain, the PS Booster
“Particle Colliders – Accelerating Innovation” symposium – Liverpool, 22 March
This symposium is organised in the framework of the Future Circular Collider study and with the support of the EuroCirCol and EASITrain H2020 projects
The year of the crab
Tests carried out in 2018 on two crab cavities in the SPS validated their technical principle and many operating parameters
International collaboration publishes concept design for a post-LHC future circular collider at CERN
The Future Circular Collider (FCC) collaboration submits its Conceptual Design Report (CDR) for publication
A brand-new beam screen to cope with high luminosity
The beam screen for the High-Luminosity LHC will be installed by 2024 in the aperture of the inner triplet superconducting magnets near ATLAS and CMS
A successful conclusion to Run 2
The end of the LHC’s second run makes way for a busy long shutdown
LHC Report: Another run is over and LS2 has just begun…
The CERN accelerator complex is being switched off step-by-step in order to prepare for Long Shutdown 2 (LS2)