News

News

First LHC sector reaches nominal temperature

Sector 4-5 of the LHC has now been cooled with superfluid helium to a temperature of 1.9 K (−271.3 °C)

News
Accelerators
24 November, 2020
Accelerators
News
24 November, 2020

LS2 Report: first beam inside the upgraded HIE-ISOLDE facility

Upgrades and repairs of the HIE-ISOLDE linear accelerator will enable experiments to delve deeper than ever into the physics of radioactive isotopes

News
Accelerators
10 November, 2020
Accelerators
News
10 November, 2020

LS2 Report: waiting for antiprotons...

In the AD hall, a beam of H- ions has reached the GBAR and ALPHA experiments, marking the end of the installation of new transfer lines from the ELENA deceleration ring

News
Accelerators
28 October, 2020
Accelerators
News
28 October, 2020

Completion of pressure tests in the LHC

The final pressure test in the LHC took place in sector 6-7 on 27 October. The pressure tests are the last step before the cooling of each sector

News
Accelerators
28 October, 2020
Accelerators
News
28 October, 2020

The PS key has been handed back to the Operations group

On 23 October, the PS returned to the Operations group’s hands. Beam commissioning in the accelerator is scheduled for 1 March 2021

News
Accelerators
28 October, 2020
Accelerators
News
28 October, 2020

LS2 Report: increased cryogenic power at LHC Point 4

At LHC Point 4, a refrigerator that cools helium from room temperature to 4.5 K (-268.65 °C) has undergone major improvements in preparation for the HL-LHC

News
Accelerators
14 October, 2020
Accelerators
News
14 October, 2020

LS2 Report: All interconnections in the LHC have been closed

The DISMAC project is coming to an end: the last of the 1232 interconnections was closed in August and the cool-down of the machine will now begin

News
Accelerators
16 September, 2020
Accelerators
News
16 September, 2020

LS2 Report: CERN’s newest accelerator awakens

Linac 4 has taken over from the retired Linac 2 as the first accelerator in the LHC injection chain

News
Accelerators
20 August, 2020
Accelerators
News
20 August, 2020

LS2 Report: Further upgrades for the PS

Two new internal beam dumps and a new septum magnet have been installed in the PS as part of the LIU project

News
Accelerators
11 August, 2020
Accelerators
News
11 August, 2020

LS2 Report: The High-Luminosity LHC is ready for injection

A new beam absorber, developed for high luminosity, has been installed in the LHC

News
Accelerators
24 July, 2020